
Bathroom Installation
Specialist

96+ Bathroom
Delivered

End to End
Installation Process

Transparent
Pricing & Timelines
Solution For Any Bathroom Installation
Assessing innovation and creativity requires evaluating both the quantity and quality of ideas, as well as their impact on the organization and its stakeholders.
96+
Completed Projects In 2025
10-14 days
Most Finished Project
3+
Trusted Partner
Showrooms
1
Tusted Installation
Team


Plumbing & Electrical Setup
All water lines, drainage systems, electrical points and lighting are installed according to Dutch safety standards, with proper testing and verification before handover.

Materials and Fixture Selection
Tiles, sanitary fittings and fixtures are selected based on durability, compatibility and manufacturer specifications to ensure correct installation and long-term use.

3D Bathroom Design
Detailed visual layouts prepared in advance so layout, measurements and material placement are finalized before on-site work begins.

Complete Bathroom Renovation
End to end bathroom renovation managed through defined stages, from demolition to final sealing, with clear planning and execution at each step.

Specialist Installation
Installation carried out by trained specialists following a step by step method, ensuring accurate fitting, proper alignment and consistent site order throughout the project.
One Trusted Team for Your Bathroom Solutions
Each category represents a distinct area of expertise or focus, with a variety of services tailored to address specific needs and challenges within that domain.
A Clear, Stress-Free Installation Process
A defined, step-by-step installation process where every decision is finalised before work begins and every stage is executed in sequence without guesswork.

1. Consultation & Measurement
We begin with an on-site visit to measure the bathroom area, check existing plumbing routes, drainage points, ventilation, radiator placement and electrical connections.
All technical requirements, such as water pressure, pipe alignment, floor slope, and wall condition, are assessed upfront so the installation plan is accurate before any work starts.
2. Design and Material Finalisation
The bathroom layout, tile sizes, fittings, sanitaryware, radiator type, and placement are finalised in advance.
Only approved materials and fixtures are recorded and locked before installation.
What is approved at this stage is exactly what gets installed, with no substitutions during execution.


3. Specialist Installation
Installation is carried out by in-house specialists using a step-by-step method.
Plumbing lines, drainage connections, electrical points, lighting, tiles, sanitary fittings, and radiators are installed in a fixed sequence to avoid rework and future issues.
Clean working practices are maintained daily, and each stage is completed and checked before moving to the next.

4. Final Checks and Immediate Use Handover
The completed bathroom is inspected for water flow, drainage performance, electrical safety, and radiator functionality, which is especially important for Dutch homes.
Sanitary fittings, joints, and edges are sealed using professional silicone kits designed for fast curing, allowing the bathroom to be ready for use within 24 to 48 hours.
The bathroom is cleaned, tested, and handed over fully functional and ready for usage.

Why Homeowners Choose Total Badkamers
-
Single Point of Contact
-
Clear Timelines and No Hidden Pricing
-
Clean, disruption-controlled execution
-
Warranty-backed installation
-
Proven track record across multiple home
Recent Bathroom Transformations
Each category represents a distinct area of expertise or focus, with a variety of services tailored to address specific needs and challenges within that domain.
Shop at Our Partner Showrooms & Save More
Upgrade your bathroom with access to exclusive product ranges and premium fittings from our trusted partner showrooms.
Clients Testimonials
What Our Clients Say
What impressed us most was the timeline. They committed to 2 weeks and actually delivered within that time without constant follow-ups.
★★★★★
Jasper Frank
Amsterdam Zuid, Netherlands
Even after the project was completed, their team came back for a small concern without hesitation. That level of accountability is rare.
★★★★☆
Jeroen van Dijk
Amsterdam West, Netherlands
You can clearly see the difference when a team follows proper processes. Everything was planned and executed professionally.
★★★★☆
Sanne Bakker
Haarlem, Netherlands
The materials installed were exactly what we selected initially. No last-minute changes or cheaper alternatives.
★★★★★
Daniel Koren
Amstelveen, Netherland
Frequently Asked Questions
Most complete bathroom installations are finished within 10–14 working days.
In complex cases, the timeline extends to a maximum of 3 weeks, with clear communication from the start.Our service includes design planning, plumbing and electrical setup, tile work, sanitary installation, fittings, and final finishing -handled end to end by our in-house team.
Yes. A clear and detailed estimate is shared before execution begins, ensuring full transparency.
Yes. You can select products from our partner showrooms or choose your preferred brands -we install exactly what is finalized.

Contact Us
Have a project in mind? Fill out the form below, and our experts will get back to you soon. Let’s bring your dream bathroom to life!
Contact Details
Address
De Corridor 14 J, 3621 ZB, Breukelen









